Date: 21st September 2010
Day: Tuesday

We continue our work to build floatilla dome after mid semester break. Before test our floatilla, we complete our dome.


Make hole at base of floatilla

Use cutter to give smooth at bamboo to prevent injured

Tight the above part of floatilla
Built the above part of floatilla  
The floatilla become complete
 Tomorrow morning, we will tight the tube tyres at base of floatilla to give our dome float and stable. After that, the floatilla is complete and can test at site that are given. We were very happy because can complete this task.

Part 4

Day : Saturday
Date: 28th August 2010

This day we wait for Samy to come Desasiswa Aman Damai to build our dome. We wait for Samy to come one hour but were very disapointed. So, we decide to start build our floatilla. First, we start to joint the base of our floatilla. We arranged the bamboo and then we repeat measure the length of floatilla. After that, we start joint the bamboo as base for the floatilla using "plastic rope". We joint the bamboo with tightly to make sure the base firmly fixed.

Arranged the bamboo follow the length.


The first layer tight.

Put the equilibrium base.
Tight the first layer with equilibrium base.
Also tight the first layer with equilibrium base.
We together tight the second layer.

The base of floatilla completed. 
So we try to sit on the base to make sure the strengthen of the base.

We were very happy because can completed the base of the bamboo. 
This is because we build the base our floatilla only two of us alone.
Although, without Samy we as a girl can do without the help of man.

Part 3

Date: 24 August 2010
Day: Tuesday

We measure the length of bamboo in size. Then, we Start to cut the bamboo in size what we need. So tired at this time... We buy the bamboo from the supplier because we loss energy to cut bamboo from bamboo site.

Buy the bamboo from supplier

Measure the length of the bamboo(180cm)

Cut the bamboo

Also cut the bamboo

The length of equilibrium base of flotilla (190cm)

The bamboo has completed cut

Part 2

Date: 17 August 2010
Day: Tuesday 

We together design our flotilla. Here, our design for flotilla


1st step
2nd Step
3rd step
4th step
Our product from front

Flotilla (Part 1)

Day  : Tuesday
Date : 10th August 2010

Members Group :-
1) Samy Mohammed
2) Normah Md.Noh
3) Nurshuhadaa Ramdan Mohamed

First, we discuss our group product and name of our group. So, we choose Black Diamond as group name. and Floatilla as our product name. We choose name of floatilla  because our product must be float.  This floatilla is able to float all group members. We also design our product. After that, We make discussion about how to build floatilla. We calculate how many lengths of bamboo we need to build this Floatilla.

Intention: To build Floatilla that able to float all grooup members 

Act: We start make discussion and design our product

 Actors:
1) Samy Mohammed
2) Normah Md.Noh
3) Nurshuhadaa Ramdan Mohamed

Rule:
1. Floatilla must be build from bamboo
2. Can float all group members
3. Prefabricated
4. Carryable only by group members
5. Assemble in 30 minutes
6. Life-span of 28 month

Place: Around USM

Product: Floatilla